2025 Tuglet Happenings

This year we launched from Harbor View Marina and moved to our dock in Spider Bay.

But of course we had a few things to install:

1.   Added power and a small Freezer under the V berth
2.   Updated all electronic charts
3.   Head shower plumbing reinstalled
4.   Bladder reinstalled
5.   Starlink AP wiring installed
6.   Installed new LI 150 Ah battery
7.   Removed 100 Ah AGM and 100 Ah Li battery
8.   Added vent holes and a fan to the V berth to boost air flow for new Freezer
9.   Switched VHF radios due to poor performance of the Std Horizon
10. Swapped out the BBQ 10lb for a 20 lb propane tank

Gear changes and status of last years changes

1. All 2024 changes worked well
2. AH usage will go up with the new freezer
3. Solar panels (350 watts) complete charging the 150 Ah Li battery by 1500

 Our voyages included visits to the following places (in order):

East Rous
Sturgeon Cove
Hotham
Spider Bay
McGregor - Usual Reasons
McGregor - East Channel
Spider Bay
East Rous
Sturgeon Cove
Jumbo Bay
Bedford
Spider Bay
Bears Bottom
Bear Drop
Long Point Cove
Nobels
Hotham
Bedford
Spider Bay
McGregor - Usual Reasons
McGregor - East Channel
McGregor - Usual Reasons
Heywood
Spider Bay
East Rous
Fox
McBean (Dead End)
Spider Bay
McGregor - Usual Reasons
Horse Shoe
Beaver Island
Spider Bay

 

Blind River  <--------------------------------------------------------------------------->  Little Current <------------>  KEYHOLE


Here some photos of the places we visited in 2025 in date sequence.

North Channel 2025